Software

None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#263 Changes by Dawid Weiss

#264 Manual run by Dawid Weiss

1 build

9 minutes

#248 Changes by Dawid Weiss

#251 Manual run by Dawid Weiss

3 builds

53 minutes

  • Average time to fix a failure: 31 minutes
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 53 minutes, from failure starting in build #248.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #248.