None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#248 |
Code changes detected
|
#251 |
Manual run by Dawid Weiss
|
3 builds 53 minutes |
#239 |
Manual run by Dawid Weiss
|
#240 |
Manual run by Dawid Weiss
|
1 build 3 days, 3 hours, 22 minutes |
- Average time to fix a failure: 1 day, 14 hours, 7 minutes
- Average number of builds between fixes: 2 builds
- The longest time taken to fix a failure is 3 days, 3 hours, 22 minutes, from failure starting in build #239.
- The greatest number of builds taken to fix a failure is 3, from failure starting in build #248.