Software

None

Recent failures

Failed In Fixed In Time Taken To Fix
#248 Code changes detected

#251 Manual run by Dawid Weiss

3 builds

53 minutes

  • Average time to fix a failure: 53 minutes
  • Average number of builds between fixes: 3 builds
  • The longest time taken to fix a failure is 53 minutes, from failure starting in build #248.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #248.