Software

None

Recent failures

Failed In Fixed In Time Taken To Fix
#248 Code changes detected

#250 Code changes detected

2 builds

38 minutes

#237 Code changes detected Commented

#241 Manual run by Dawid Weiss

4 builds

8 weeks, 6 minutes

#225 Code changes detected

#227 Code changes detected

2 builds

26 minutes

  • Average time to fix a failure: 2 weeks, 4 days, 16 hours, 23 minutes
  • Average number of builds between fixes: 2.67 builds
  • The longest time taken to fix a failure is 8 weeks, 6 minutes, from failure starting in build #237.
  • The greatest number of builds taken to fix a failure is 4, from failure starting in build #237.