Software

None

Recent plan failures

Failed In Fixed In Time Taken To Fix
#117 Changes by Dawid Weiss

#120 Manual run by Dawid Weiss

3 builds

52 minutes

#110 Manual run by Dawid Weiss

#111 Manual run by Dawid Weiss

1 build

7 minutes

  • Average time to fix a failure: 29 minutes
  • Average number of builds between fixes: 2 builds
  • The longest time taken to fix a failure is 52 minutes, from failure starting in build #117.
  • The greatest number of builds taken to fix a failure is 3, from failure starting in build #117.