None
Recent failures
Failed In | Fixed In | Time Taken To Fix | ||
---|---|---|---|---|
#135 |
Code changes detected
|
Currently failing | ||
#118 |
Manual run by Dawid Weiss
|
#119 |
Manual run by Dawid Weiss
|
1 build 44 minutes |
- Average time to fix a failure: 15 weeks, 13 hours, 39 minutes
- Average number of builds between fixes: 0.5 builds
- The longest time taken to fix a failure is 30 weeks, 1 day, 2 hours, 35 minutes, from failure starting in build #135.
- The greatest number of builds taken to fix a failure is 1, from failure starting in build #118.