Build: #11 was successful
Job: Reports was successful
Using pooling manager with more than one controller: Test case result
The below summarizes the result of the test "Using pooling manager with more than one controller" in build 11 of Carrot2 - 3.16.x - software - bugfix-3.10.x - Reports.
- Description
- Using pooling manager with more than one controller
- Test class
- org.carrot2.core.ControllerTest
- Method
- testUsingPoolingManagerWithMoreThanOneController
- Duration
- < 1 sec
- Status
- Successful